Projects We've Completed
Exterior
Removed 8 overgrown trees close to the sides of house (2006)
Pressure washed front steps and foundation (2006)
Spackled foundation (2006)
Painted foundation with masonry paint, painted entire house exterior (2006)
Painted iron railing at front steps (2006)
Fixed crack on front steps (2006)
Repaired cracks on driveway with cement, had driveway sealed (2007)
Added electrical power source to front yard (2007)
New roof (2008)
Built vinyl picket fence around backyard (2008)
Painted backyard patio (2008)
Replaced exterior light fixture in back of house (2009)
Repaired rear left gutter/downspout (2010)
Patched/refinished end of driveway (2010)
Stained swing set (2010)
Replaced gutter system (2011)
Garage
Painted left & right walls and shelving (2006)
Had faucet/hose attachment repaired (2006)
Replaced ceiling (2006)
Replaced drywall around heating ducts (2009)
Replaced support pole (2010)
Replaced Garage Doors (2011)
Downstairs Hallway/Bathroom
Installed new flooring (2006)
Installed replacement toilet and shower
faucet/head for downstairs bathroom. Plumbling replaced. (2006)
Installed new light fixture (2007)
Replaced sconce fixture (2009)
Painted bathroom walls and ceiling (2010)
Painted hallway (2010)
Replaced vanity and faucet (2010)
Added GFCI electrical outlets to bathroom (2011)
Molly and Mia's Room
Added halogen track system (2007)
Built storage area under stairs (2007)
Removed wallpaper and paneling, spackled walls, and painted room (2008)
Added walls and door to create this room (2009)
Removed carpeting, replaced with laminate flooring (2010)
Repaired damaged walls and re-painted (2010)
Playroom
Added halogen track system (2007)
Removed wallpaper and paneling (2008)
Removed carpeting, replaced with laminate flooring (2010)
Repaired damaged walls and re-painted (2010)
Laundry Room
Added halogen track system (2007)
Painted walls (2007)
Painted cement floor (2007)
Entryway
Installed chandelier (2008)
Installed wood railing (2008)
Refinished stair treads and painted risers (2009)
Replaced storm door (2009)
Installed new flooring (2010)
Painted area (2010)
Living Room
Added halogen track system (2007)
Installed roman shades (2008)
Painted room (2009)
Dining Room
Installed chandelier and medallion (2006)
Painted lower half of room (2009)
Installed roman shade (2011)
Kitchen
Purchased/Installed new kitchen cabinet hardware (2006)
Replaced appliances: Stainless steel refrigerator, range (ceramic top), and range hood (2006)
Repaired Garbage Disposal (2006)
Repaired crack in ceiling, painted (2006)
Installed pendant lighting (2007)
New countertops, flooring, sink, and faucet (2008)
Updated switch/outlet covers (2008)
Installed glass mosaic tile backsplash (2009)
Installed under-cabinet lighting (2009)
Replaced dishwasher (2009)
Added glass inserts to six cabinet doors (2009)
Painted room (2009)
Refinished cabinets (2011)
Installed GFCI outlet (2011)
Replaced lighting over sink with pendant (2011)
Upstairs Hallway
Re-covered shelves in linen closet (2006)
Painted hallway (2009)
Kid's Bathroom
Installed new flooring (2007)
Replaced vanity top (2007)
Painted shower tiles (2007)
Replaced light fixture (2007)
Replaced sink faucet (2009)
Replaced shower fixtures (2009)
Painted room (2010)
Replaced medicine cabinet (2010)
Re-tiled shower (2010)
Added GFCI electrical outlets (2011)
Replaced toilet (2011)
Will's Room
Painted and installed new closet doors (2006)
Painted room and created accent wall (2008)
Refinished hardwood floors (2008)
Installed new ceiling fan with wireless control (2010)
Lily's Room
Painted closet doors (2006)
Refinished hardwood floors (2008)
Installed chandelier with medallion and dimmer (2008)
Painted room (2010)
Master Bedroom
Removed old carpeting (2006)
Wired cable television into room (2006)
Refinished hardwood floors (2007)
Installed cellular shades (2008)
Painted room (2008)
Installed chandelier with medallion and dimmer (2008)
Removed ironing center and built custom built-in shelving (2008)
Installed new closet doors (2011)
Master Bathroom
Replaced toilet (2006)
Installed new flooring (2007)
Replaced vanity (upgraded to 36-inch), new faucet (2007)
Painted medicine cabinet (2007)
Replaced light fixture, towel rod, toilet paper holder (2007)
Painted ceiling (2007)
Painted room (2007)
Had shower re-tiled, added shower door, some plumbing replaced (2008)
Replaced medicine cabinet (2008)
Replaced all shower drain components (2010)
Refinished vanity (2011)
Attic
Built plywood floor, creating storage space (2006)
Added 2 junction boxes (2008)
Added electrical outlets (2008)
Throughout and Misc.
Replaced all light switch plates (2006/2007)
Added security system and service (2007)
Installed new furnace and hot water heater (2009)
Painted all window sills (2009)
Replaced all interior doors and hardware (2011)